Price updated as of February 2,2018
for free site tripping schedule & reservation:
for free site tripping schedule & reservation:
Globe : O917 3939 227
TAMARA SUBDIVISION:
- Provision for 3 Bedrooms
- Living Area
- Dining Area
- Kitchen Area
- 1 Toilet & Bath
HOUSE SPECIFICATION ( TURN-OVER UNIT)
- FLOOR FINISHES
- Ground Floor : Plain Cement Finish
- Second Floor: Plain Cement Finish
- Toilet & Bath: Unglazed Ceramic Tiled Finish
- WALL FINISHES
- Interior Wall: Plastered Cement Finish
- Exterior Wall: Painted Cement Finish
- Toilet & Bath: Plastered Cement Finish with 1 layer Ceramic tiles
- ROOFING
- Pre-painted roof on steel roof framing
- DOOR
- Main Entry: Steel
- Service Door: Flush Hallow Core
- Toilet & Bath: PVC
- WINDOWS
- Ground Floor: Steel Cement
- 2nd Floor: Jalousie
- STAIRS
- Steel with Handrail
- CEILING
- Insulation
- KITCHEN COUNTER
- Plaster Cement
- Finish with Stainles
- Sink
- TOILET & BATH
- Pail Type with shower head
FAQ (Frequently Ask Question)
1. How can I Reserve a Unit?
- Contact us O917 3939 227 for site viewing schedule. If OFW Buyer please arrange with your family representative to view the actual unit model. Please advise us 1 or 2 days before the schedule for the free vehicle (cut-off until 2pm)
- OFW
- A copy of Passport
- Latest Job Contract
- 2 Valid ID's of your Representive here in Philippines
- Locally Employed
- 2 Government Valid ID's
- Latest three (3) months Payslip or
- Certificate of Employment with Compensation
- Reservation Fee : P5,000
- RFO Units:
- Pay Full Required Downpayment
- After Pag-Ibig Loan Release. Estimated processing 4-6mos.
- Pre-Selling Units:
- After full payment of downpayment
- After Pag-Ibig of Bank Loan Release
- Estimated Turn-over 2 years.
- Yes. Buyer must submit layout of improvement to the developer's Engineering Dept for approval. Improvement start after Move-in
5. Is there a Construction Bond on House Improvement?
- Yes. This applies to all construction improvement outside or inside the unit. This is refundable if there is no property damage incurred after the construction. Estimated amount starts at Php 10,000 - up.
6. Who will take care of my Meralco & Water Connection?
- Utilities connection is applied individually by the Buyer.
for free site tripping schedule & reservation:
Globe : O917 3939 227
No comments:
Post a Comment